Installation
- Release time:2020-01-02 16:27:00
详情
Our company is specialized in submarine pipeline laying, cable pulling, large-size structures lifting, pile-driving, living accommodation, platform dis-assembly, pipe cleaning, pressure test and other projects.
It has its own Enterprise 3 derrick lay barge, which is 120 meters long, 31.7 meters wide and 9 meters deep, with maximum operation capacity reaching 150 meters.
Besides, it carries 800T full slewing crane and 8 anchor positioning system that is capable of laying pipes from 6 to 36 inches, satisfying the living need of 300 people.
|
|
Write a Comment
Footer Nav
底部多项